Jump to content


WARNING - RED Canvass production - Bad Checks

  • Please log in to reply
No replies to this topic

#1 Robert Starling SOC

Robert Starling SOC

    Advanced Member

  • Sustaining Members
  • 1133 posts
  • Las Vegas, NV

Posted 28 December 2009 - 09:24 PM

Heads up to other Steadicam ops and production peeps out there on a project called RED Canvass that came through Las Vegas last week and left behind a string of bad checks with local crew here. Not one bad check but many bad checks to the locals.

Luckily for once I was not on this job but apparently they came in, did 16-17 hour days, racked up lots of OT and then the checks that were cut last Weds still won't clear the bank. I only know of one AC that got his check through. Also, they left an injured crew member here with no Workmans Comp and he'll be out for three months.

I'm particularly surprised because the DP was Conrad Hall, Jr and while he's not Production you'd think he'd take care of the local camera crew. If anyone knows him they should give him the heads up.

  • 0

Varizoom Follow Focus


Betz Tools for Stabilizers

Camera Motion Research

Ritter Battery

GPI Pro Systems

Wireless Video Systems

PLC - Bartech

Omnishot Systems

rebotnix Technologies

Boland Communications

PLC Electronics Solutions



Paralinx LLC